Skip to the timeline
Thomasparketpro

Het werk gaat door · Eight stages

The work goes on

Sanding a wooden floor: everything you need to know — laid out in the order it actually happens, from the first survey to the way the floor reads years later.

Typical job
3–5 days
Dust
Extracted
You stay
At home
Surprises
Priced first

Eight promises, in order

Every claim below belongs to a moment in the job

Pick one to jump straight to the stage where it is earned.

The timeline

From survey to a floor you stop noticing — because it looks right

Stage 01 of 8 · A week before · survey

One visit, one honest read of the floor

Garden room strip floor with orange-brown varnish worn patchy and grey before sanding

The boards are checked for thickness left above the tongue, moisture, hidden filler, staples and old adhesive. Herringbone, panels, a rotten corner under a radiator — whatever the floor turns out to be, you hear it on the spot and see it written into the scope.

Every complexity — the mission is possible
On site
About 45 minutes
You receive
A written scope
Stage 02 of 8 · Day 1 · morning

Screens up, coarse pass down

An oak strip floor half sanded, pale new wood on one side of the line and yellowed old finish on the other, belt sander in the foreground

Doorways are screened, the machines are hooked to extraction that bags the dust at the source, and the first coarse pass takes off the old finish and the grey, dead top of the wood. This is the moment a tired floor stops being a covering and becomes timber again.

Give your hardwood floor a second life
Noise
Loudest half-day
Dust
Into sealed bags
Stage 03 of 8 · Day 1 · afternoon

Repairs, gaps and the pattern put back

Pale new oak strips let into an existing yellowed strip floor along a wall, the joins staggered so the two interlock

Everything the coarse pass exposed gets dealt with before any finish goes near it: loose boards refixed, damaged sections cut back to a joist and replaced in matched wood, wide gaps wedged, fine ones filled with paste made from your own sanding dust. Herringbone and panel borders are re-cut so the pattern reads as one piece.

Elegant design solutions
Filler colour
Your own dust
Extra work
Priced before it starts
Stage 04 of 8 · Day 2 · morning

Fine pass, edges blended by hand

An oak strip floor being sanded by the garden doors, pale sanded wood to the left and darker, stained wood still to come on the right

Each pass removes the marks of the pass before it until the grain is closed and the surface is flat. Edges and corners are machined separately, then blended into the field so you cannot find where one machine stopped. The floor is checked in raking light before anything is applied.

Your floor looks like new again
Passes
Coarse → medium → fine
Check
Raking light
Stage 05 of 8 · Day 2 · midday

Samples on your own boards, in your own light

An oak strip floor divided by a line of masking tape, raw sanded wood on one side and freshly lacquered wood on the other, roller in the foreground

Oil, hardwax and lacquer are brushed onto the floor you have just had sanded, not onto a showroom offcut. You judge them at midday and again in the evening, matt beside satin beside gloss, and the recommendation follows how the room is actually used.

Matt or gloss — everyone chooses for themselves
Samples
Two or three
Stage 06 of 8 · Day 2 · afternoon

The finish goes on, thin and even

Lacquer being rolled onto oak mosaic parquet, the coated part still wet and glossy, roller in the foreground

Oil is worked into the grain and the surplus buffed off; lacquer is rolled in one direction over a primer with edges cut in by hand. Rooms are done one at a time, stairs in halves, so the house stays liveable while the last coat is laid.

The closing chord for your floor
Coats
Two to three
Odour
Water-based, low
Stage 07 of 8 · Day 3–5 · curing

Quiet days, then the handover

Oak mosaic parquet in basket-weave blocks, lacquered to a high gloss, beside a dark cabinet with a wine cooler

Socks the next day, furniture after two or three, rugs after one to two weeks — a surface still curing under a rug stays soft and prints. At handover you get the care products, the schedule for the first weeks and a walk round the finished floor in daylight.

The result will exceed your expectations
Walk on it
Next day, socks
Rugs back
1–2 weeks
Stage 08 of 8 · Year one and onwards

The floor that carries the room

Oak herringbone parquet across a bay-window room, warm under evening light

Vacuum before you mop, felt under every chair leg, a maintenance coat in the hallway when the traffic route starts to dull. Do that little and the floor keeps the depth it got on day two — and the room reads finished rather than renovated.

It really does look noble and luxurious
Refresh
Routes only
Next full sanding
7–10 years away

Stage 01 starts with a measurement

Send the room sizes and a photo of the floor. You get an honest read of what it needs, a written quote, and a date for day one.