Skip to content
Thomasparketpro

01 · SERVICE · SANDING

Wooden floor sanding

Sanding is where every renovation starts. Layer by layer the old finish, the grey top of the wood and the scratches come off, until a flat, clean surface is left that will take oil, wax or lacquer evenly.

  • Typical duration1–2 days
  • DustExtracted at source
  • ResultBare, flat wood
Sanded pine floorboards running the length of a bare, white-walled room

The full story

One flat, clean surface — before anything is applied

A floor is sanded in passes. The first coarse pass takes down the old finish and the worst of the damage, the next passes remove the marks left by the pass before it, and a fine pass closes the grain so the finish does not blotch. Edges and corners are done with a separate machine, then blended into the field so you cannot see where one machine stopped.

The machines are connected to extraction, so the dust goes into a sealed bag rather than onto your shelves. Doorways are screened off and the room is left swept — you will still find a fine film in the first days, as with any building work, but not the grey cloud people remember.

Sanding is also the moment a floor tells you what it needs. Loose boards, old filler, nails and gaps show up under the machine, and get dealt with before the finish goes on rather than being sealed underneath it.

Right for you if

  • A floor with scratches, grey patches or a worn, flaking finish
  • A newly laid unfinished floor that needs to be levelled and closed
  • A colour or sheen change — a new finish only holds on bare wood

On the day

How a sanding day runs

  1. Clear and screen

    Furniture out, skirting protected, doorways screened. Sockets are used for the extraction, so a free circuit helps.

  2. Coarse pass

    Old finish and the damaged top layer come off. Nails are set below the surface as they appear.

  3. Repair and fill

    Loose boards fixed, gaps and nail holes filled with a paste made from your own sanding dust.

  4. Fine pass

    Field and edges sanded fine and blended, then vacuumed and checked in raking light before finishing.

Scope

What the quote covers — and what it does not

No surprises on the invoice. This is the standard scope for a sanding job; anything outside it is listed and priced separately before work starts.

Included as standard

  • Coarse, medium and fine passes across the whole floor
  • Edges and corners machined and blended by hand
  • Nails set below the surface, loose boards refixed
  • Gaps and nail holes filled with paste from your own dust
  • Dust extraction at source and a swept, vacuumed room

Quoted separately

  • Replacing damaged or rotten boards
  • The finish itself — oil, hardwax or lacquer
  • Moving heavy furniture or lifting fitted carpet
  • Skirting, thresholds and radiator pipe collars

The result

Bare wood, ready to take colour

Drag the handle to see the same boards before sanding and after the fine pass — same floor, no filler colour, no sealing over damage.

See more projects →
The same room after sanding, the oak planks pale and even from the brick wall to the window
Dark, worn oak plank floor beside an exposed brick wall, with one small square sanded back to pale wood in the middle of the room
beforeafter

Finish options

Four ways to finish the same floor

Colour and sheen change how a room reads. Thomasparketpro brings samples so you can judge them on your own boards, in your own light.

  • Wide-plank light oak floor running towards garden doors, still at the finishing stage

    Natural oil

    MATT · WARM

    Deepens the wood a shade and keeps the grain open.

  • Pitch pine plank floor sanded back to a natural pale tone in a room with a bay window

    White oil

    MATT · LIGHT

    Holds back the yellow in oak and lifts a dark room.

  • Old pine floorboards sanded smooth and even, in front of tall panelled double doors

    Hardwax

    SATIN · TOUGH

    Looks like oil, resists water like a light lacquer.

  • An oak strip floor divided by a line of masking tape, raw sanded wood on one side and freshly lacquered wood on the other, roller in the foreground

    Lacquer

    MATT TO GLOSS

    A sealed film for stairs, hallways and shops.

Oil · hardwax · lacquer, side by side
PropertyOilHardwaxLacquer
LookMatt, open grainMatt or satinMatt, satin or gloss
Feel underfootLike bare woodWood with a closed topSealed film
Water and spillsWipe up promptlyBeads on the surfaceBest in class
Local repairSpot by spotRefresh a routeScreen the whole area
CleaningOil soap, damp mopWax soap, damp mopNeutral cleaner, damp mop
Refresh interval2–4 years3–5 years7–10 years

Sanding sits underneath all three — the choice is only about the finish on top.

They took a grey, scratched pine floor back to clean wood in a day and a half, and the house was still liveable that evening.
Renovation in Utrecht · 62 m² pine
A floor specialist working a rotary buffing machine across a dark herringbone parquet floor

What drives the price

Priced per project, not per guess

Every quote is written after seeing the floor. These are the factors that move the number up or down, so you know what you are being asked about.

  1. Floor area

    The single biggest factor. One total in square metres is enough for a first quote.

  2. Condition

    Deep scratches, paint, adhesive residue or an old thick lacquer mean extra coarse passes.

  3. Wood and pattern

    Herringbone, panels and end-grain blocks are sanded in more directions than straight planks.

  4. Access and rooms

    Stairs, small rooms and many doorways cost more edge work than one open floor.

Start with the area

Measure your rooms in a minute — the total travels with your quote request, so the first reply already fits your project.

  • Multiple rooms in one total
  • Comma or period decimals
  • No account, no obligation
Open the floor area calculator

Afterwards

Keeping the finish

Sanding itself needs no aftercare — the finish you choose next decides how the floor is cleaned and refreshed.

First 48 hours

Keep it light

Do not put rugs or furniture felts back before the finish has cured; the surface is still soft.

Weekly

Dry first, damp second

Vacuum or sweep before mopping — grit left on the floor is what actually scratches it.

Every 5–8 years

Screen, do not strip

Most floors only need a light screen and a fresh coat, not a full sanding, if the finish is kept up.

Questions

Asked before every job

Something else on your mind? Ask it in the quote request — you get a written answer, not a call centre.

The machines extract at the source into sealed bags, so there is no cloud and no grey layer on your shelves. Expect a fine film in the first days — as with any work in a lived-in house — and doorways screened off while the machines run.

All services →

Ready to take your floor back to bare wood?

Send the room measurements and a photo of the floor — you get an honest recommendation and a written quote.